Flora Gardens

Multi Utility Connections For 3 Plot Development 

Gas

  • Lay new gas mains and connect 3x LP services terminating externally into uniboxes
  • 3x LP U6 gas meter installs

Electric

  • 3 x DOMESTIC 230V, 1 PH 50HZ connections
  • This quotation is based on the cost of installing a single-phase electric supply.
  • Construction works including: Excavation, Backfill & Resurfacing
  • Cable installation & Live jointing onto network.

Water

Mains:

  • Piece-up connection – Surfaced (50mm to 99mm)
  • 50 x additional metre of PE main – Lay only (50mm-99mm)
  • Mains requisition processing fee
  • Branch connection – Surfaced (50mm to 99mm)

Connections:

  • 3x 25mm metered service connections

Flora gardens is a small development in the village of Woodford in Cheshire.  Woodford is a picturesque town south of Manchester famous for the production of over 3,000 Lancaster bombers during the second world war.

Utility Site Services were engaged by a local property developer to install the gas electricity and water connections to the site which was a redevelopment of a single substantial property into multiple smaller dwellings.

Project challenges mainly centred around easements and wayleaves. Our pro-active approach, led by the project manager, made sure the client was well advised navigated through those hurdles. Our engagement of the local council assisted in the reduction of traffic management lead in times due to the location of the parent mains in what is a busy main road.

We provided the developer with an end to end solution buy extending the respective mains onto site, connecting independent services to those mains and organising the clients metering.

 

Project Value – £41,581.72